MAPREDUCE-3134. Added documentation the CapacityScheduler.
git-svn-id: https://svn.apache.org/repos/asf/hadoop/common/trunk@1178530 13f79535-47bb-0310-9956-ffa450edef68
This commit is contained in:
parent
4ee39ffe6a
commit
43b59b894b
@ -333,6 +333,8 @@ Release 0.23.0 - Unreleased
|
||||
MAPREDUCE-2889. Added documentation for writing new YARN applications.
|
||||
(Hitesh Shah via acmurthy)
|
||||
|
||||
MAPREDUCE-3134. Added documentation the CapacityScheduler. (acmurthy)
|
||||
|
||||
OPTIMIZATIONS
|
||||
|
||||
MAPREDUCE-2026. Make JobTracker.getJobCounters() and
|
||||
|
@ -3,76 +3,92 @@
|
||||
<property>
|
||||
<name>yarn.scheduler.capacity.maximum-applications</name>
|
||||
<value>10000</value>
|
||||
<description>Maximum number of applications that can be running.
|
||||
<description>
|
||||
Maximum number of applications that can be pending and running.
|
||||
</description>
|
||||
</property>
|
||||
|
||||
<property>
|
||||
<name>yarn.scheduler.capacity.maximum-am-resource-percent</name>
|
||||
<value>0.1</value>
|
||||
<description>
|
||||
Maximum percent of resources in the cluster which can be used to run
|
||||
application masters i.e. controls number of concurrent running
|
||||
applications.
|
||||
</description>
|
||||
</property>
|
||||
|
||||
<property>
|
||||
<name>yarn.scheduler.capacity.root.queues</name>
|
||||
<value>default</value>
|
||||
<description>The queues at the this level (root is the root queue).
|
||||
<description>
|
||||
The queues at the this level (root is the root queue).
|
||||
</description>
|
||||
</property>
|
||||
|
||||
<property>
|
||||
<name>yarn.scheduler.capacity.root.capacity</name>
|
||||
<value>100</value>
|
||||
<description>The total capacity as a percentage out of 100 for this queue.
|
||||
If it has child queues then this includes their capacity as well.
|
||||
The child queues capacity should add up to their parent queue's capacity
|
||||
or less.</description>
|
||||
</property>
|
||||
|
||||
<property>
|
||||
<name>yarn.scheduler.capacity.root.acl_administer_queues</name>
|
||||
<value>*</value>
|
||||
<description>The ACL for who can administer this queue. i.e.
|
||||
change sub queue allocations.</description>
|
||||
<description>
|
||||
The total capacity as a percentage out of 100 for this queue.
|
||||
If it has child queues then this includes their capacity as well.
|
||||
The child queues capacity should add up to their parent queue's capacity
|
||||
or less.
|
||||
</description>
|
||||
</property>
|
||||
|
||||
<property>
|
||||
<name>yarn.scheduler.capacity.root.default.capacity</name>
|
||||
<value>100</value>
|
||||
<description>default queue target capacity.</description>
|
||||
<description>Default queue target capacity.</description>
|
||||
</property>
|
||||
|
||||
<property>
|
||||
<name>yarn.scheduler.capacity.root.default.user-limit-factor</name>
|
||||
<value>1</value>
|
||||
<description>default queue user limit a percantage from 0.0 to 1.0.
|
||||
<description>
|
||||
Default queue user limit a percentage from 0.0 to 1.0.
|
||||
</description>
|
||||
</property>
|
||||
|
||||
<property>
|
||||
<name>yarn.scheduler.capacity.root.default.maximum-capacity</name>
|
||||
<value>-1</value>
|
||||
<description>the maximum capacity of the default queue -1 disables.
|
||||
<description>
|
||||
The maximum capacity of the default queue. A value of -1 disables this.
|
||||
</description>
|
||||
</property>
|
||||
|
||||
<property>
|
||||
<name>yarn.scheduler.capacity.root.default.state</name>
|
||||
<value>RUNNING</value>
|
||||
<description>The state of the default queue. can be RUNNING or STOPPED
|
||||
<description>
|
||||
The state of the default queue. State can be one of RUNNING or STOPPED.
|
||||
</description>
|
||||
</property>
|
||||
|
||||
<property>
|
||||
<name>yarn.scheduler.capacity.root.default.acl_submit_jobs</name>
|
||||
<value>*</value>
|
||||
<description>The ACL of who can submit jobs to the default queue.
|
||||
<description>
|
||||
The ACL of who can submit jobs to the default queue.
|
||||
</description>
|
||||
</property>
|
||||
|
||||
<property>
|
||||
<name>yarn.scheduler.capacity.root.default.acl_administer_jobs</name>
|
||||
<value>*</value>
|
||||
<description>The ACL of who can administer jobs on the default queue.
|
||||
<description>
|
||||
The ACL of who can administer jobs on the default queue.
|
||||
</description>
|
||||
</property>
|
||||
|
||||
<property>
|
||||
<name>yarn.scheduler.capacity.root.acl_administer_queues</name>
|
||||
<value>*</value>
|
||||
<description>
|
||||
The ACL for who can administer this queue i.e. change sub-queue
|
||||
allocations.
|
||||
</description>
|
||||
</property>
|
||||
|
||||
|
@ -0,0 +1,309 @@
|
||||
~~ Licensed under the Apache License, Version 2.0 (the "License");
|
||||
~~ you may not use this file except in compliance with the License.
|
||||
~~ You may obtain a copy of the License at
|
||||
~~
|
||||
~~ http://www.apache.org/licenses/LICENSE-2.0
|
||||
~~
|
||||
~~ Unless required by applicable law or agreed to in writing, software
|
||||
~~ distributed under the License is distributed on an "AS IS" BASIS,
|
||||
~~ WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
|
||||
~~ See the License for the specific language governing permissions and
|
||||
~~ limitations under the License. See accompanying LICENSE file.
|
||||
|
||||
---
|
||||
Hadoop Map Reduce Next Generation-${project.version} - Capacity Scheduler
|
||||
---
|
||||
---
|
||||
${maven.build.timestamp}
|
||||
|
||||
Hadoop MapReduce Next Generation - Capacity Scheduler
|
||||
|
||||
\[ {{{./index.html}Go Back}} \]
|
||||
|
||||
%{toc|section=1|fromDepth=0}
|
||||
|
||||
|
||||
* {Purpose}
|
||||
|
||||
This document describes the <<<CapacityScheduler>>>, a pluggable scheduler
|
||||
for Hadoop which allows for multiple-tenants to securely share a large cluster
|
||||
such that their applications are allocated resources in a timely manner under
|
||||
constraints of allocated capacities.
|
||||
|
||||
* {Overview}
|
||||
|
||||
The <<<CapacityScheduler>>> is designed to run Hadoop applications as a
|
||||
shared, multi-tenant cluster in an operator-friendly manner while maximizing
|
||||
the throughput and the utilization of the cluster.
|
||||
|
||||
Traditionally each organization has it own private set of compute resources
|
||||
that have sufficient capacity to meet the organization's SLA under peak or
|
||||
near peak conditions. This generally leads to poor average utilization and
|
||||
overhead of managing multiple independent clusters, one per each organization.
|
||||
Sharing clusters between organizations is a cost-effective manner of running
|
||||
large Hadoop installations since this allows them to reap benefits of
|
||||
economies of scale without creating private clusters. However, organizations
|
||||
are concerned about sharing a cluster because they are worried about others
|
||||
using the resources that are critical for their SLAs.
|
||||
|
||||
The <<<CapacityScheduler>>> is designed to allow sharing a large cluster while
|
||||
giving each organization capacity guarantees. The central idea is
|
||||
that the available resources in the Hadoop cluster are shared among multiple
|
||||
organizations who collectively fund the cluster based on their computing
|
||||
needs. There is an added benefit that an organization can access
|
||||
any excess capacity no being used by others. This provides elasticity for
|
||||
the organizations in a cost-effective manner.
|
||||
|
||||
Sharing clusters across organizations necessitates strong support for
|
||||
multi-tenancy since each organization must be guaranteed capacity and
|
||||
safe-guards to ensure the shared cluster is impervious to single rouge
|
||||
application or user or sets thereof. The <<<CapacityScheduler>>> provides a
|
||||
stringent set of limits to ensure that a single application or user or queue
|
||||
cannot consume dispropotionate amount of resources in the cluster. Also, the
|
||||
<<<CapacityScheduler>>> provides limits on initialized/pending applications
|
||||
from a single user and queue to ensure fairness and stability of the cluster.
|
||||
|
||||
The primary abstraction provided by the <<<CapacityScheduler>>> is the concept
|
||||
of <queues>. These queues are typically setup by administrators to reflect the
|
||||
economics of the shared cluster.
|
||||
|
||||
To provide further control and predictability on sharing of resources, the
|
||||
<<<CapacityScheduler>>> supports <heirarchical queues> to ensure
|
||||
resources are shared among the sub-queues of an organization before other
|
||||
queues are allowed to use free resources, there-by providing <affinity>
|
||||
for sharing free resources among applications of a given organization.
|
||||
|
||||
* {Features}
|
||||
|
||||
The <<<CapacityScheduler>>> supports the following features:
|
||||
|
||||
* Heirarchical Queues - Heirarchy of queues is supported to ensure resources
|
||||
are shared among the sub-queues of an organization before other
|
||||
queues are allowed to use free resources, there-by providing more control
|
||||
and predictability.
|
||||
|
||||
* Capacity Guarantees - Queues are allocated a fraction of the capacity of the
|
||||
grid in the sense that a certain capacity of resources will be at their
|
||||
disposal. All applications submitted to a queue will have access to the
|
||||
capacity allocated to the queue. Adminstrators can configure soft limits and
|
||||
optional hard limits on the capacity allocated to each queue.
|
||||
|
||||
* Security - Each queue has strict ACLs which controls which users can submit
|
||||
applications to individual queues. Also, there are safe-guards to ensure
|
||||
that users cannot view and/or modify applications from other users.
|
||||
Also, per-queue and system administrator roles are supported.
|
||||
|
||||
* Elasticity - Free resources can be allocated to any queue beyond it's
|
||||
capacity. When there is demand for these resources from queues running below
|
||||
capacity at a future point in time, as tasks scheduled on these resources
|
||||
complete, they will be assigned to applications on queues running below the
|
||||
capacity. This ensures that resources are available in a predictable and
|
||||
elastic manner to queues, thus preventing artifical silos of resources in
|
||||
the cluster which helps utilization.
|
||||
|
||||
* Multi-tenancy - Comprehensive set of limits are provided to prevent a
|
||||
single application, user and queue from monpolizing resources of the queue
|
||||
or the cluster as a whole to ensure that the cluster isn't overwhelmed.
|
||||
|
||||
* Operability
|
||||
|
||||
* Runtime Configuration - The queue definitions and properties such as
|
||||
capacity, ACLs can be changed, at runtime, by administrators in a secure
|
||||
manner to minimize disruption to users. Also, a console is provided for
|
||||
users and administrators to view current allocation of resources to
|
||||
various queues in the system. Administrators can also
|
||||
<add additional queues> at runtime.
|
||||
|
||||
* Drain applications - Administrators can <stop> queues
|
||||
at runtime to ensure that while existing applications run to completion,
|
||||
no new applications can be submitted. If a queue is in <<<STOPPED>>>
|
||||
state, new applications cannot be submitted to <itself> or
|
||||
<any of its child queueus>. Existing applications continue to completion,
|
||||
thus the queue can be <drained> gracefully. Administrators can also
|
||||
<start> the stopped queues.
|
||||
|
||||
* Resource-based Scheduling - Support for resource-intensive applications,
|
||||
where-in a application can optionally specify higher resource-requirements
|
||||
than the default, there-by accomodating applications with differing resource
|
||||
requirements. Currently, <memory> is the the resource requirement supported.
|
||||
|
||||
[]
|
||||
|
||||
* {Configuration}
|
||||
|
||||
* Setting up <<<ResourceManager>>> to use <<<CapacityScheduler>>>
|
||||
|
||||
To configure the <<<ResourceManager>>> to use the <<<CapacityScheduler>>>, set
|
||||
the following property in the <<conf/yarn-site.xml>>:
|
||||
|
||||
*--------------------------------------+--------------------------------------+
|
||||
|| Property || Value |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
| <<<yarn.resourcemanager.scheduler.class>>> | |
|
||||
| | <<<org.apache.hadoop.yarn.server.resourcemanager.scheduler.fifo.CapacityScheduler>>> |
|
||||
*--------------------------------------------+--------------------------------------------+
|
||||
|
||||
* Setting up <queues>
|
||||
|
||||
<<conf/capacity-scheduler.xml>> is the configuration file for the
|
||||
<<<CapacityScheduler>>>.
|
||||
|
||||
The <<<CapacityScheduler>>> has a pre-defined queue called <root>. All
|
||||
queueus in the system are children of the root queue.
|
||||
|
||||
Further queues can be setup by configuring
|
||||
<<<yarn.scheduler.capacity.root.queues>>> with a list of comma-separated
|
||||
child queues.
|
||||
|
||||
The configuration for <<<CapacityScheduler>>> uses a concept called
|
||||
<queue path> to configure the heirarchy of queues. The <queue path> is the
|
||||
full path of the queue's heirarcy, starting at <root>, with . (dot) as the
|
||||
delimiter.
|
||||
|
||||
A given queue's children can be defined with the configuration knob:
|
||||
<<<yarn.scheduler.capacity.<queue-path>.queues>>>
|
||||
|
||||
Here is an example with three top-level child-queues <<<a>>>, <<<b>>> and
|
||||
<<<c>>> and some sub-queues for <<<a>>> and <<<b>>>:
|
||||
|
||||
----
|
||||
<property>
|
||||
<name>yarn.scheduler.capacity.root.queues</name>
|
||||
<value>a,b,c</value>
|
||||
<description>The queues at the this level (root is the root queue).
|
||||
</description>
|
||||
</property>
|
||||
|
||||
<property>
|
||||
<name>yarn.scheduler.capacity.root.a.queues</name>
|
||||
<value>a1,a2</value>
|
||||
<description>The queues at the this level (root is the root queue).
|
||||
</description>
|
||||
</property>
|
||||
|
||||
<property>
|
||||
<name>yarn.scheduler.capacity.root.b.queues</name>
|
||||
<value>b1,b2,b3</value>
|
||||
<description>The queues at the this level (root is the root queue).
|
||||
</description>
|
||||
</property>
|
||||
----
|
||||
|
||||
* Queue Properties
|
||||
|
||||
* Resource Allocation
|
||||
|
||||
*--------------------------------------+--------------------------------------+
|
||||
|| Property || Description |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
| <<<yarn.scheduler.capacity.<queue-path>.capacity>>> | |
|
||||
| | Queue <capacity> in percentage (%). |
|
||||
| | The sum of capacities for all queues, at each level, should be less than |
|
||||
| | or equal to 100. |
|
||||
| | Applications in the queue may consume more resources than the queue's |
|
||||
| | capacity if there are free resources, providing elasticity. |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
| <<<yarn.scheduler.capacity.<queue-path>.maximum-capacity>>> | |
|
||||
| | Maximum queue capacity in percentage (%). |
|
||||
| | This limits the <elasticity> for applications in the queue. |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
| <<<yarn.scheduler.capacity.<queue-path>.minimum-user-limit-percent>>> | |
|
||||
| | Each queue enforces a limit on the percentage of resources allocated to a |
|
||||
| | user at any given time, if there is demand for resources. The user limit |
|
||||
| | can vary between a minimum and maximum value. The former depends on the |
|
||||
| | number of users who have submitted applications, and the latter is set to |
|
||||
| | this property value. For e.g., suppose the value of this property is 25. |
|
||||
| | If two users have submitted applications to a queue, no single user can |
|
||||
| | use more than 50% of the queue resources. If a third user submits an |
|
||||
| | application, no single user can use more than 33% of the queue resources. |
|
||||
| | With 4 or more users, no user can use more than 25% of the queues |
|
||||
| | resources. A value of 100 implies no user limits are imposed. |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
| <<<yarn.scheduler.capacity.<queue-path>.user-limit-factor>>> | |
|
||||
| | The multiple of the queue capacity which can be configured to allow a |
|
||||
| | single user to acquire more resources. By default this is set to 1 which |
|
||||
| | ensures that a single user can never take more than the queue's configured |
|
||||
| | capacity irrespective of how idle th cluster is. |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
|
||||
* Running and Pending Application Limits
|
||||
|
||||
|
||||
The <<<CapacityScheduler>>> supports the following parameters to control
|
||||
the runnign and pending applications:
|
||||
|
||||
|
||||
*--------------------------------------+--------------------------------------+
|
||||
|| Property || Description |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
| <<<yarn.scheduler.capacity.maximum-applications>>> | |
|
||||
| | Maximum number of jobs in the system which can be concurently active |
|
||||
| | both running and pending. Limits on each queue are directly proportional |
|
||||
| | to their queue capacities. |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
| yarn.scheduler.capacity.maximum-am-resource-percent | |
|
||||
| | Maximum percent of resources in the cluster which can be used to run |
|
||||
| | application masters - controls number of concurrent running applications. |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
|
||||
* Queue Administration & Permissions
|
||||
|
||||
The <<<CapacityScheduler>>> supports the following parameters to
|
||||
the administer the queues:
|
||||
|
||||
|
||||
*--------------------------------------+--------------------------------------+
|
||||
|| Property || Description |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
| <<<yarn.scheduler.capacity.<queue-path>.state>>> | |
|
||||
| | The <state> of the queue. Can be one of <<<RUNNING>>> or <<<STOPPED>>>. |
|
||||
| | If a queue is in <<<STOPPED>>> state, new applications cannot be |
|
||||
| | submitted to <itself> or <any of its child queueus>. |
|
||||
| | Thus, if the <root> queue is <<<STOPPED>>> no applications can be |
|
||||
| | submitted to the entire cluster. |
|
||||
| | Existing applications continue to completion, thus the queue can be
|
||||
| | <drained> gracefully. |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
| <<<yarn.scheduler.capacity.root.<queue-path>.acl_submit_jobs>>> | |
|
||||
| | The <ACL> which controls who can <submit> jobs to the given queue. |
|
||||
| | If the given user/group has necessary ACLs on the given queue or |
|
||||
| | <one of the parent queues in the hierarchy> they can submit jobs. |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
| <<<yarn.scheduler.capacity.root.<queue-path>.acl_administer_jobs>>> | |
|
||||
| | The <ACL> which controls who can <administer> jobs on the given queue. |
|
||||
| | If the given user/group has necessary ACLs on the given queue or |
|
||||
| | <one of the parent queues in the hierarchy> they can administer jobs. |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
|
||||
<Note:> An <ACL> is of the form <user1>, <user2><space><group1>, <group2>.
|
||||
The special value of <<*>> implies <anyone>. The special value of <space>
|
||||
implies <no one>.
|
||||
|
||||
* Reviewing the configuration of the CapacityScheduler
|
||||
|
||||
Once the installation and configuration is completed, you can review it
|
||||
after starting the YARN cluster from the web-ui.
|
||||
|
||||
* Start the YARN cluster in the normal manner.
|
||||
|
||||
* Open the <<<ResourceManager>>> web UI.
|
||||
|
||||
* The </scheduler> web-page should show the resource usages of individual
|
||||
queues.
|
||||
|
||||
[]
|
||||
|
||||
* {Changing Queue Configuration}
|
||||
|
||||
Changing queue properties and adding new queues is very simple. You need to
|
||||
edit <<conf/capacity-scheduler.xml>> and run <rmadmin -refreshQueues>.
|
||||
|
||||
----
|
||||
$ vi $HADOOP_CONF_DIR/capacity-scheduler.xml
|
||||
$ $YARN_HOME/bin/rmadmin -refreshQueues
|
||||
----
|
||||
|
||||
<Note:> Queues cannot be <deleted>, only addition of new queues is supported -
|
||||
the updated queue configuration should be a valid one i.e. queue-capacity at
|
||||
each <level> should be equal to 100%.
|
||||
|
@ -45,3 +45,5 @@ Hadoop MapReduce Next Generation
|
||||
|
||||
* {{{./WritingYarnApplications.html}Writing Yarn Applications}}
|
||||
|
||||
* {{{./CapacityScheduler.html}Capacity Scheduler}}
|
||||
|
||||
|
Loading…
Reference in New Issue
Block a user